N | Serial Number | Location | Logical Nr | Crate SNr | Crate InvNr | PSupply SNr | PSupply InvNr | TCM | Changed on |
---|---|---|---|---|---|---|---|---|---|
1 | 1 | Y21-top (EMBar) | 1 | 1896066 | 577#1 | 1396005 | 577#5 | 0 | 2015-03-24 |
2 | 2 | Y11-bot (EMEC) | 2 | 1896863 | 577#6 | 1896053 | 577#6 | 0 | 2014-08-31 |
3 | 3 | Y21-bot (EMEC) | 3 | 1896067 | 577#8 | 1896050 | 577#1 | 0 | 2016-09-23 |
4 | 4 | Y10-bot (HadEC/FCAL) | 4 | 1896060 | 577#4 | 1896059 | 577#4 | 0 | 2014-08-31 |
5 | 5 | Y22-bot (HadEC/FCAL) | 5 | 1896061 | 577#7 | 1896049 | 577#2 | 0 | 2014-05-09 |
6 | 6 | Y10-top (HadBar) | 6 | 1396006 | 577#2 | 1896054 | 577#7 | 0 | 2014-08-31 |
7 | 7 | Y22-top (HadBar) | 7 | 1896068 | 577#5 | 1896058 | 577#8 | 0 | 2014-07-07 |
8 | 10 | Y11-top (EMBar) | 0 | 1896062 | 577#3 | 1896052 | 577#9 | 0 | 2014-08-31 |
9 | 90 | KIP lab (Test Rig +48V) | 90 | 1896064 | 577#0 | 1896051 | 577#10 | 0 | 2007-06-28 |
10 | 100 | CERN TestRig (B. 104) | 100 | 1896065 | 577#9 | 1896053 | 577#6 | 0 | 2017-01-24 |
11 | 111 | KIP lab (ReservePSU) | 111 | 0 | 0 | 1896057 | 577#3 | 0 | 2007-06-28 |
12 | 112 | KIP lab (ReservePSU) | 112 | 0 | 0 | 1896056 | 577#11 | 0 | 2007-06-28 |
N | Date | File | Comment |
---|---|---|---|
1 | 2015-03-24 | PpmNrs.24-03-2015.txt | After swapping pp1-ppm09 with pp3-ppm08 |
2 | 2014-09-01 | PpmNrs.01-09-2014.txt | After all eight crates have been installed with nMCM |
3 | 2014-07-04 | PpmNrs.04-07-2014.txt | After all four C side crates have been installed with nMCMs |
4 | 2012-03-05 | PpmNrs.05-03-2012.txt | Replaced pp3-ppm08 with other spare board |
5 | 2012-02-09 | PpmNrs.10-02-2012.txt | Swapped pp0-ppm15 with pp0-ppm14 |
6 | 2011-12-12 | nMCM_0001_Test1.txt | |
7 | 2010-07-19 | PpmNrs.19-07-2010.txt | Swapped pp1-ppm15 with pp2-ppm08 and replaced pp3-ppm08 |
8 | 2010-03-16 | PpmNrs.16-03-2010.txt | replaced spare PPM pp2-ppm00 |
9 | 2009-09-22 | PpmNrs.22-09-2009.txt | All 4 spare PPMs and 5 system PPMs replaced by P&K. |
10 | 2009-06-08 | PpmNrs.08-06-2009.txt | Replaced 4 PPMs and CPLD firmware update |
11 | 2009-05-08 | PpmNrs.08-05-2009.txt | Replaced 4 PPMs |
12 | 2009-02-06 | PpmNrs.06-02-2009.txt | Swapped pp6-ppm0-slot5 with pp6-ppm1-slot6 on accident (slot/ppm mix up). Later swapped correctly pp6-ppm5-slot10 with pp6-ppm6-slot11 while hunting down link down errors. Also accidentally swapped pp7-ppm7-slot12 with pp7-ppm8-slot13 (again slot/ppm mix |
13 | 2009-01-29 | PpmNrs.29-01-2009.txt | Swapped pp3-ppm02 with pp3-ppm00 (spare) because pp3-ppm02 showed massive LVDS link problems and parity errors. |
14 | 2009-01-23 | PpmNrs.23-01-2009.txt | After Paul and Klaus visited. Five PPMs exchanged by new boards from KIP: pp2-ppm08, pp3-ppm00, pp3-ppm08, pp4-ppm04, pp7-ppm02. |
15 | 2008-12-03 | PpmNrs.03-12-2008.txt | Swapped pp6-ppm03 with pp2-ppm00 (spare) because pp6-ppm03 has not been producing rate metering. |
16 | 2008-11-28 | PpmNrs.28-11-2008.txt | Swapped pp0-ppm15 with pp0-ppm14 because pp0-ppm15-mcm2:BC was seeing LVDS link down on the CP side. When swapped the problem moved with the PPM. |
17 | 2008-11-14 | PpmNrs.14-11-2008.txt | Replaced pp3-ppm10 with spare in pp2-ppm8 and 4 other MCMs. |
18 | 2008-07-25 | PpmNrs.25-07-2008.txt | Swapped two PPMs between spares in Crate 3 and two bad PPMs in Crate 7 |
19 | 2008-06-26 | PpmNrs.26-06-2008.txt | After Paul and Klaus visited. 10 PPMs exchanged. |
20 | 2008-06-23 | PpmNrs.23-06-2008.txt | Before Paul and Klaus start swapping PPMs. Identical to previous scan of 2008-05-23. Just for safety. |
21 | 2008-05-23 | PpmNrs.23-05-2008.txt | Replaced pp2-ppm07 (board 41) with pp3-ppm8 (board 144) because of persistent glink error. |
22 | 2008-04-25 | PpmNrs.25-04-2008.2.txt | Swapped pp1 ppm07 and pp3 ppm0 because after the previous swap with pp1 ppm08, the problematic channel followed the ppm. This is on channel MCM 7 B and C. |
23 | 2008-04-25 | PpmNrs.25-04-2008.txt | Swapped pp1 ppm08 and ppm07 because ppm08 is suspected of having an LVDS problem on MCM 7, Channel B and C. After the swap the problem moved with ppm. Labeled as PPM Problem. |
24 | 2008-04-24 | PpmNrs.24-04-2008.txt | Swapped 2 PPMs For JEM problems |
25 | 2008-04-23 | PpmNrs.23-04-2008.txt | Swapped 2 PPMs and replaced a single PPM because of suspected JEM problems. Swapped the incorrect PPMs. |
26 | 2008-04-11 | PpmNrs.11-04-2008.txt | After Paul Hanke's Visit |
27 | 2008-04-10 | PpmNrs.10-04-2008.txt | During Paul Hanke's Visit |
28 | 2008-03-19 | PpmNrs.18-03-2008.txt | After some PPM Swaps for suspect JEM Channels |
29 | 2007-12-19 | PpmNrs.19-12-2007.txt | After Paul Hanke's Visit |
30 | 2007-12-13 | PpmNrs.13-12-2007.txt | During Paul Hanke's Visit |
31 | 2007-12-12 | PpmNrs.12-12-2007.txt | Before Paul Hanke's Visit |